High Pressure CFB Boiler Header of Boiler Parts

1. Header Arrangement: Arrange convection heating surface of evaporator at the end part of boiler and total 46 ranks and made up by φ42×3 piping. Arrange 5 piping circulation. The lower header is φ426×16 and the collecting piping at top is φ76×3. The whole system is natural circulation and hanging arrangement to increase boiler evaporating heating surface. 2. Company introduction:          Established in 1954, Jinan Boiler Group Co., Ltd. ( Hereinafter called "JBG" ) is a large backbone company that manufactures Grade "A" power boilers and industrial boilers in China, and is also one of the leading companies for CFB boiler and biomass boilers. With the total asset value being over RMB 2 billion, JBG has 1300 employees, including 300 engineering technical staff. Located in the famous historical and cultural city -Jinan, the capital of Shandong Province, which is called "City of Springs".         Majoring in…

Similar

Coal/Biomass/Waste to Energy Power Plant EPC Projects
3MW-200MW Coal/Biomass/Waste Fired Power Plant EPC
HT HP Pulverized Coal Fired PC Boiler
Pulverized Coal Fired PC Boiler
75 T/H Medium Temperature and Pressure Gas-Fired Boiler
Boiler Drum Boiler pressure parts
Membrane Water Wall of Boiler Water Cooling System
60 T/H Lean Coal Fired CFB Boiler
40 T/H Bituminous Coal/Anthracite/Lignite Fired CFB Boiler
50 T/H Bituminous Coal/Anthracite/Lignite Fired CFB Boiler
60 T/H Bituminous Coal/Anthracite/Lignite Fired CFB Boiler
75 T/H Bituminous Coal/Anthracite/Lignite Fired CFB Boiler

Jinan Boiler Group Co., Ltd.

Established in 1954, Jinan Boiler Group Co., Ltd. (Hereinafter called [JBG") is located in the famo…

Download

Download Current

Copyrights © 2024 alederlight.com All Rights.Reserved .