Drilling and blasting trolleys break the construction dilemma   Industry pain points Tunnel drilling and blasting construction has long faced the dilemma of "human sea tactics": it is difficult to recruit blasters at the face, the risk of manual drilling in the surrounding rock crushing section is extremely high, and over-excavation causes a surge in support costs. Traditional manual drilling and blasting is not only inefficient (single hole takes 12 to 15 minutes), but also has frequent safety accidents. Construction of surrounding rock above grade IV is particularly difficult.   Your troubles Safety risks: manual face operation, landslides and water gushing can easily cause mass deaths and injuries; Cost out of control: over-excavation rate reaches more than 15%, and support materials are wasted significantly; Efficiency bottleneck: the speed of manual drilling drops sharply at high altitudes and fault zones, and the average daily footage is less than 6 meters.   Our solution: Intel…

Similar

high performance Drilling Machine for Geological Boreholes
Efficient Hydraulic drilling rig for Metal mine construction
Custom CNC Milling Solutions for Railway Tunnel Construction
Portable Down-the-Hole Excavator Rig for Site Preparation
Reliable hydraulic stone splitting machine
well DTH Drill Rig for Deep Hole Applications
Advanced Down-the-Hole Drilling Equipment for Mining
CYLJ45 Mining Crawler Diesel Electric Tunneling Vehicle
Advanced Hydraulic drilling rigs for mining operations
Durable Hydraulic Drilling Machine for Heavy-Duty Tasks
ANZ-45B Well Drilling Rig with Crawler System
Efficient DTH Drilling Equipment for Rock drilling

Jiangsu Aneng Drilling Equipment Technology Co., Ltd.

Jiangsu Aneng Drilling Equipment Technology Co., Ltd. is located in Xuzhou, the capital of China's e…

Download

Download Current

Copyrights © 2025 alederlight.com All Rights.Reserved .