Drilling and blasting trolleys break the construction dilemma
Industry pain points
Tunnel drilling and blasting construction has long faced the dilemma of "human sea tactics": it is difficult to recruit blasters at the face, the risk of manual drilling in the surrounding rock crushing section is extremely high, and over-excavation causes a surge in support costs. Traditional manual drilling and blasting is not only inefficient (single hole takes 12 to 15 minutes), but also has frequent safety accidents. Construction of surrounding rock above grade IV is particularly difficult.
Your troubles
Safety risks: manual face operation, landslides and water gushing can easily cause mass deaths and injuries;
Cost out of control: over-excavation rate reaches more than 15%, and support materials are wasted significantly;
Efficiency bottleneck: the speed of manual drilling drops sharply at high altitudes and fault zones, and the average daily footage is less than 6 meters.
Our solution: Intel…