Poor efficiency of multi-machine coordination?
After drilling rigs are used to drill holes, it takes 1 hour for drilling and splitting machines to enter the site. Excavator converted drilling rigs also need to vacate the site, and equipment idleness has become the norm - this is an old problem in hard rock construction. Do you often watch the daily workload stuck in a bottleneck due to equipment connection faults? The drilling and splitting machine is here to break the deadlock: it is not only a drilling expert, but also a splitting main force. Its "independent" character can connect the entire crushing process. In limestone mining, it does not require the cooperation of other equipment. It splits immediately after drilling (100-200mm aperture). The daily processing volume is 200 cubic meters more than the "drilling rig + splitting machine" combination, and the cost of 2 coordination personnel is saved.
Application scenarios are more linked: In municipal demolition, first cooperat…